Dry Riser Cabinets

A dry riser cabinet, also called a dry riser box or inlet box, is the steel enclosure that protects a dry riser’s breeching inlet, where the fire service pumps water in from outside. We stock the 2 way breeching inlet cabinet in red RAL 3000 powder coated Zintec steel, with a Georgian wired glass window and a Yale slam lock.

It suits 100mm mains and surface mounts to masonry or façades, with free next working day delivery to mainland UK. For siting, BS 9990 and Approved Document B, see our dry riser cabinets guide.

No products found.

What a dry riser cabinet is for

A dry riser is a vertical main that runs up through a building and normally stands empty. When the fire and rescue service arrives, a pumping appliance connects to the breeching inlet at ground level and charges the pipe with water, and crews then draw from a landing valve on the floor they are working on. Nothing sits in the main until it is needed, which is the difference between a dry riser and a wet riser, where the main is permanently charged from a tank and pump inside the building.

The inlet is where all of that begins, and it sits on an external wall within reach of the street. An enclosure goes around it for three reasons. It keeps weather and dirt off connections that have to couple first time. It keeps casual interference away from equipment nobody should be handling. And it marks the position, so that a crew arriving at night at a building they have never attended can find the inlet without hunting for it.

None of that is the job an access panel does. An access panel is about tidy, occasional access to building services. This is fire service equipment on a route that has to stay obvious, unobstructed and quick to use under pressure, and it should be chosen on that basis. Browse the full access panel range if service access, rather than fire main equipment, is what you are actually looking for.

Standards, and who decides what is needed

Two questions sit behind nearly every enquiry that reaches this page. Which standard applies, and who decides what a building needs. Neither one is answered by the company that supplies the enclosure.

We can tell you what we sell and what the product information states. We cannot tell you whether your building needs a fire main, how it should be configured, where the inlet has to sit, or whether a given enclosure satisfies a requirement somebody has written into a specification. Those belong to the fire engineer, the designer and the approving authority, working from the building’s fire strategy and Approved Document B. If a clause has already been written for your project, send it to us with your enquiry and we will tell you plainly whether what we stock matches it.

Dry riser or wet riser

A dry main is charged by the attending appliance. A wet main is charged permanently from within the building. Which of the two a building gets is a design decision taken as part of the fire strategy, tied to height and to how the building is to be fought, and it is not a choice made from a product catalogue.

In England and Wales, fire mains are required in buildings where the top storey exceeds 18 m, while wet risers are typically used above 50 m.

BS 9990

BS 9990 is the British Standard covering non automatic fire fighting systems in buildings, dry and wet risers among them, across design, installation, testing and maintenance. It is named here so you know where the subject is documented. We supply equipment only, and we do not carry out riser design, testing or maintenance.

For UK sites, industry guidance aligned to BS 9990:2015 calls for a six-monthly visual check and an annual wet pressure test, typically to 12 bar, with records retained in the fire logbook. Cabinets commonly use FB-pattern locks or slam locks so firefighters can gain entry with standard FB keys carried on appliances. Property managers often hold a set for inspections.

The BS 5041 series

The BS 5041 parts are the component standards commonly cited for items such as breeching inlets, landing valves and inlet boxes. They are mentioned here as context for the vocabulary you will meet on a specification. We make no certification claim to any part of the series for the products on this page, so if a submission needs documentation, please ask us before you order.

You may see specifications referencing Part 3 (two-way inlet breeching), Part 4 (outlet boxes) and Part 5 (inlet cabinets). On recessed outlet sets, the architrave is the visible frame and door trim that finishes flush to the wall around the landing-valve opening.

What to send with an enquiry

The clause or schedule wording exactly as written, the number of inlet ways called for, how and where the unit is to be mounted, and any documentation the submission requires. That is enough for us to tell you whether the product fits the brief, or whether you need to look elsewhere.

The two products in this category

This is a short category and it is worth being straightforward about that. There are two products here, and the page is not a range.

The 2 way breech inlet dry riser door is the enclosure for a two way breeching inlet. Two way means two inlet connections. If your specification calls for a four way inlet, we do not stock one, so raise it at enquiry stage rather than after an order has gone through.

The second product is a riser door, listed as 90 minutes fire rated with 60 minutes of fire rated insulation from both sides and 48dB acoustic performance. It is a shaft door rather than an inlet enclosure, and it sits in this category because riser shafts and dry risers turn up on the same drawings. If a shaft door is what you are really after, our riser doors range treats the subject properly, and made to measure riser doors covers openings that no stock size fits.

Dimensions, construction, finishes and any documentation belong on the product pages themselves rather than in a category summary, because those are the figures that get transcribed into a submission and they need to come from the source. If what you need is not there, ask us through our quote form before ordering.